Engineering LLP specializes in delivering innovative and efficient solutions for diverse industries. With a focus on precision and quality, we offer expert services in project design, development, and management. Our team collaborates closely with clients to ensure timely, cost-effective, and sustainable outcomes. From infrastructure to technology-driven projects, we bring expertise, reliability, and cutting-edge solutions to every project we undertake. Partner with us for successful engineering solutions tailored to your needs.
Network Survey Vehicle (NSV) survey for Four Laning of Gomati Chauraha-Udaipur Section of NH-8 (from Km. 177/100 to Km. 260/100) in the State of Rajasthan under NHDP Phase IV on DBFOT (Toll) basis; Client: NHAI; Total length: 83.100 Km; Lane: 4; Project Cost: INR 114.27 Crore (Conduct in December, 2020)
Network Survey Vehicle (NSV) survey for Four Laning of Gomati Chauraha-Udaipur Section of NH-8 (from Km. 177/100 to Km. 260/100) in the State of Rajasthan under NHDP Phase IV on DBFOT (Toll) basis; Client: NHAI; Total length: 83.100 Km; Lane: 4; Project Cost: INR 114.27 Crore (Conduct in September, 2021)
Network Survey Vehicle (NSV) Survey of project stretch which starts from Chainage 90+000 of NH-79 At Gulabpura and ends at Chainage 214+870 of NH-79 at Chittorgarh in the State of Rajasthan; Client: NHAI; Total length: 124.870 Km; Lane: 6; Project Cost: INR 1239.82 Crore (Conduct in August, 2021)
Network Survey Vehicle (NSV) Survey for (1) Four Laning of Chittorgarh-Kota Section of NH-27 from Km. 891.929 to Km. 1052.429 and (2) Four Laning of Rajsamand-Bhilwara Section of NH-758 from Km. 0.000 to Km. 87.250 in the State of Rajasthan; Client: NHAI; Total length: 247.75 Km; Lane: 4; Project Cost: INR 92.00 Crore (Chittorgarh-Kota) & INR 677.79 Crore (Rajsamand-Bhilwara) (Conduct in September, 2020)
Network Survey Vehicle (NSV) Survey for (1) Four Laning of Chittorgarh-Kota Section of NH-27 from Km. 891.929 to Km. 1052.429 and (2) Four Laning of Rajsamand-Bhilwara Section of NH-758 from Km. 0.000 to Km. 87.250 in the State of Rajasthan; Client: NHAI; Total length: 247.75 Km; Lane: 4; Project Cost: INR 92.00 Crore (Chittorgarh-Kota) & INR 677.79 Crore (Rajsamand-Bhilwara) (Conduct in June, 2021)
Detailed Engineering Design Consultancy Services for Up gradation to 2 lane with paved shoulder/ 4 lane of Gagaria – Baori Kalan – Serwa – Bakhasar Section of NH-925 (Design Chainage 0+000 to 136+520) and Sata – Gandhav Section of NH 925A (Design Chainage 0+000 to 60+450) (Total length 196.970 km) under Bharatmala Pariyojana in the State of Rajasthan on EPC Mode; Client: GHV (India) Pvt. Ltd. / NHAI; Total length: 197.69 Km (2 lane: 181.63 Km & 4 lane: 16.06 Km); Project Cost: INR 902.00 Crore
Pre-bid Engineering Services for Six lane access controlled Highway from Km 0.00 to Km 40.080 (Paniyala to Mator Section) of Paniyala – Barodameo ICR in the State of Rajasthan on EPC Mode under Bharatmala Pariyojana; Client: M/s Bharat Vanijya Eastern Pvt. Ltd.; Total length: 40.08 Km; Lane: 6; Project Cost: INR 1306.78 Crore
Pre-bid Engineering Services for Six lane access controlled Highway from Km 40.080 to Km 86.513 (Mator to Barodameo Section) of Paniyala – Barodameo ICR in the State of Rajasthan on EPC Mode under Bharatmala Pariyojana; Client: M/s Bharat Vanijya Eastern Pvt. Ltd.; Total length: 46.433 Km; Lane: 6; Project Cost: INR 1388.95 Crore
Pre-bid Engineering Services for Up gradation to 2 lane with paved shoulder/4 lane of Gagaria-Baori Kalan Serwa-Bakhasar section of NH-925 and Sata-Gandhav Section of NH 925A under Bharatmala Pariyojana in the State of Rajasthan on EPC mode; Client: GHV (India) Pvt. Ltd.; Total length: 197.69 Km (2 lane: 181.63 Km & 4 lane: 16.06 Km); Project Cost: INR 902.00 Crore
Pre-bid Engineering Services for Balance Works of Six Laning of Jaipur Ring Road between Agra Road and Ajmer Road Section in the State of Rajasthan on EPC Mode; Client: GHV (India) Pvt. Ltd.; Total length: 47 Km; Lane: 6; Project Cost: INR 959.50 Crore